Launch Date : Aug 2017
Possession : Dec 2022
Total Land Area : 6.6 Acres
Number of Units : 487
Tower Details : Number of towers: 2
Floor Details : 16+Ground
Furnished? : Unfurnished
Water Facility : BWSSB
Total Free Space : 70 percent
Bangalore Electricity Supply Company (BESCOM):
Bangalore Water Supply & Sewerage Board (BWSSB):
Swimming Pool
Outdoor Play Field
Cricket Net
Children's Play Area
Club House
Gymnasium
Sewage Treatment Plant
Water Treatment Plat (RO)
Rain Water Harvesting
StructureMain Door : Teak Frame with hardwood flush shutter with teak veneer two side polish ![]() Toilet Door : Wooden door frame with flush door shutter ![]() Other Internal Door : Wooden door frame with flush door shutter |
Flooring![]() Individual Unit Foyer, Living & Dining : Vitrified tiles flooring ![]() Master Bedroom : Wooden laminate flooring ![]() Kitchen : Ceramic tiles flooring ![]() All Bedrooms : Vitrified tiles flooring ![]() Balconies & Utility : Anti skid ceramic tiles flooring ![]() Toilets : Anti skid ceramic tiles flooring |
Kitchen![]() Granite counter and Sink ![]() Sink and Tap Fittings |
ToiletsWash basin -Master Bedroom : Hindware/Jaquar or equivalent Wash basin -Other Bedroom : Hindware/Jaquar or equivalent EWC's -Master Bedroom : Hindware/Jaquar or equivalent EWC's -Other Bedrooms : Hindware/Jaquar or equivalent |
Painting![]() Internal Walls & Ceilings : OBD |
Electrical Outline Specification2 BHK Flat : 3 KW 3 BHK Flat : 4 KW ![]() 100% DG back up for lifts, pumps & common area lighting : 1 BHK- 0.75 KW | 2, 2.5, 3 BHK - 1 KW ![]() Concealed PVC conduits with Copper wiring ![]() Modular Switches of reputed make |